Friday, October 5, 2007

Drywall

David worked real hard and finished drywalling our garage. I am sure that you know what it looked like before.It will not only help regulate the temperature in there, but it just plain looks better finished. Now we can park both vehicles INSIDE!!

Thursday, September 27, 2007

Coming Soon.....


There will be a virtual tour of our home coming soon...so stay tuned for the update!!!!!

Wednesday, September 26, 2007

When The Wife Is Away.........

The Husband Will...WORK!!!

My husband is THE BEST!! There is NOTHING that he can't do!! While I was away on my road trip with the kids he was busy. Between work and school, he found time to do these projects while I was gone:


He built an entertainment center.

Here is the space before:

And here it is after... WOW!! What a Handyman




He also put hardware on our kitchen Cabinets.


Here they are before:




And here they are after:






He also built some shelves in the coat/linen closet. They look like they were built in with the house!!



He also started to insulate and drywall the garage. Those before and after pictures will come when he is finished. David can learn to do anything that he puts his mind to. Sorry ladies..he's all mine!!!


Before & After



So for those of you who don't know we DID close on and move into our home on the 23rd/24th of August. I haven't posted for a while b/c we have been so busy. We replaced a few things in the house already and added some things that weren't there before, but there are a few more to follow... Check it out....



Entry Light Before:

Entry Light After:



Nook/Dining Light Before:


Nook/Dining Light After:

Kitchen Faucet Before:


Kitchen Faucet After:
Towel Bars Before:


Towel Bars After:





Before there was no light overhead, just a hole...now there's light!!
Master Bedroom:

Kids Rooms & Study:
Family Room:
It took him 12+ hours to install it, but David, with a little help from Isaac, installed our garage door opener all by himself. He had to cut the brackets himself. It was a lot of work, but he did an awesome job and it works great!! It runs very quietly which I love!!
Thanks Babe!!

Tuesday, August 14, 2007

The Outside Is Done!

The outside is complete!!
For those who don't know, we have our final walk through this Thursday and we close next Thursday. Which means that we will be moving next weekend!!

Saturday 8/11

Tuesday, July 17, 2007

Before & After

Just a quick B&A
Not exactly the same angle, but you get the idea. The cabinets are in!





The Grass Truly is Greener..

When it's in your very own yard!!

Saturday 7/14

Wednesday, July 11, 2007

We Have 1/2 A Yard

They put in the sprinkler system in the front as well as the rock and a couple trees. We had to get 3 angles so that you can see it all. We will get another picture of the inside b/c they have painted the inside and they have our counters hung and are tiling the bathrooms. We should close on the house in about 6 weeks, give or take.



Tuesday 7/3

Saturday, June 16, 2007

The Color of Our Home Is...

Mesquite Canyon Red
They painted the house, well most of it anyway. They still need to paint the front post, back post, the door and the shutters. We will update the paint job as soon as they get it finished. We can't wait!!


Sunday 6/10

Thursday, June 7, 2007

First Walk Through

We had our first walk-through this morning. It was real neat to see the inner workings of our home. Tomorrow they have inspections scheduled, and if everything goes well then they will start to insulate and drywall next week. Our construction manager told us that it would be about 8-10 weeks for delivery from the time they drywall if everything goes smoothly. We get more excited every day. Here are just a few of the 100+ pictures that we took:
This is the view into the house from the garage:
The view from the entry hall into the living room:

The view from the kitchen island to the bedrooms:

The view of the basement:

The view of the kitchen from the bedroom hallway:


The back view of the house:

This is our backyard:


All photos taken today - Thursday 6/7




Wednesday, June 6, 2007

Houston...We Have A Driveway!

Yep, we now have a driveway and a back patio.
We do our pre-drywall walk through tomorrow, and then it's on to Phase II.
In case you didn't notice it before, they also put a sign in the window
that says "Under Contract".
Tuesday 6/5

Monday, June 4, 2007

Roof Is Done

It doesn't look like they have done much other than that.I think
they are pretty much done with the outside other than painting the house.
We have our first walk through this week, then they should start on the inside.
Saturday 6/2
Saturday 6/2


Wednesday, May 30, 2007

Shingles Are Going UP

They got the roof 1/2 shingled.
Unfortunately it's the side you can't see. I know what you're all thinking...why didn't we take a picture of the back side. Well we could have, but then all our pictures wouldn't be the same. And those who know me know that I just can't have that.
Wednesday 5/30
Wednesday 5/30

Saturday, May 26, 2007

Doors & Shutters

As you can see, the front door and shutters are on. They should pour the driveway and shingle the roof this next week!!


Friday 5/25

Tuesday, May 22, 2007

Siding

The siding sure went up fast! Can't wait to see what's next!

Tuesday 5/22

Sunday, May 20, 2007

Windows

You can barely tell, but if you look closely you can see that they put the windows in!
Friday 5/18

Thursday, May 17, 2007

The Roof Is Up

Well, they got the roof on. David took another picture today, but it looks pretty much the same, so just this one picture until things change.
Wednesday 5/16